SystemTest PM, 16-11-2004 ------------------------- DH, private notes type0-cables: Danilon and Leo were supposed to come up with a proposal how to distribute the _presently_40_cables_waiting_in_Bonn_ for distribution. Fabian will sort that out. ROD status: Able to make multi-module multi-DSP scan now. Fitting and ToT support have to be done; are next steps. PixLib/ROD: testing fit procedure on the ROD in LBL, milestone reached. verifying fit results and ToT mode support are next steps. next big step, necessary for TurboDAQ "compatibility": 2D scans present activity: proper tuning scans STControl: multi-mode scan with 3 modules okay chain (DB-generation, scan, ModuleAnalysis) tested Fabien: asks for priorities for scanning capabilities W'tal: New regulator board with old controler board tested + Wiener Crate CPPM: 13 modules configured, evapor. C4F10 @15 degrees, maximum module temperatures below 23 degrees => SUCCESS bi-stave in W'tal not before PS-PRR Peter suggests to distribute BOC-cards, no requests from any group A 64bit PCIbus PC is needed to support the S-Link board, if a setup for this has to be mounted. The CTB hardware will be dismounted at CERN and the material will move to the SR building. nxt Meetg: ***